West Fraser Mills photo

West Fraser Mills photo

UPDATE: West Fraser to permanently reduce production in Quesnel, Fraser Lake

The move, due to log supply shortages, will affect 75 employees in Quesnel, 60 in Fraser Lake

UPDATE:

After West Fraser’s Nov. 13 announcement that its third sawmill shift in both Quesnel and Fraser Lake would be permanently shut down from January 2019, Black Press caught up with Brian Balkwill, vice president of Canadian Wood Products, to obtain more details on the layoffs.

Balkwill said the change will be permanent after January, and is due to log shortages, rather than the market. He told Black Press that West Fraser had increased its production and harvesting to salvage timber affected by the Mountain Pine Beetle while it was still viable, always knowing it would mean reducing production later on.

“The logs are no longer available to sustain the mills at the current production level. We are dropping back down so essentially our production levels in the mill will match the timber supply. That’s our strategy. It’s not about short-term markets. … It’s more about trying to match our production capacity with the available timber,” he said.

He said the increase in log price as the timber supply drops has meant that it’s not economically viable for the company to travel farther distances outside the timber supply area to get logs.

The third shifts in the Quesnel and Fraser Lake sawmills will be shut down as of Jan. 14, 2019, affecting 50 workers in Quesnel and 40 in Fraser Lake. Balkwill said the additional workers affected (25 in Quesnel and 20 in Fraser Lake) will be in the planer mill, and these shifts will be curtailed once the crews run though the inventory.

“It’ll be weeks after [Jan. 14] that we’ll continue on three shifts [in the planer mill] until we get our inventory level where we want it to be. It’ll probably be the end of the first quarter, into the second quarter, where we’ll have our inventory back where we want it to be.”

West Fraser said in its Nov. 13 press release that it hopes to offer the 135 affected employees jobs at other divisions within the company. Balkwill said it will be easier for employees to remain in their community in Quesnel, with the company having two pulp mills, an MDF plant, plywood plant and sawmill in town.

“That will increase our ability to have people take on positions in those plants,” he explained.

“In Fraser Lake, we only have the one facility, so the opportunities for people to do something in Fraser Lake with our company will be limited, so they’ll be looking at opportunities at our other divisions in B.C. or Alberta.”

He said as long as employees are willing to relocate, West Fraser has committed to finding positions 135 workers.

As to the future, Balkwill said he’s hopeful these production cuts will bring the company back in alignment with log supply so that no further cuts are needed.

“We will continue to look at it as the markets change … there are a lot of things that impact available timber supply. It’s tough for me to say this is the end, but at this time we don’t have any other plans [for cuts],” he commented.

West Fraser supplies lumber to the Canadian and U.S. markets, as well as China and Japan.

The news of West Fraser’s production cuts comes after Quesnel’s Tolko Questwood division shut down operations in mid-October. Tolko cited high log costs and poor market conditions as the reason for the decision.

Conifex in Fort St. James will also be shut down for at least four weeks as of Monday this week (Nov. 12). Canfor’s sawmill in Prince George has also curtailed production at its sawmill.

ORIGINAL:

West Fraser sawmills in Quesnel and Fraser Lake will be eliminating the third shift at each sawmill to reduce lumber production, according to a news release dated Nov. 13.

The curtailment of approximately 300 million board feet of combined lumber is expected to impact around 75 employees in Quesnel and 60 in Fraser Lake over the first and second quarter of 2019.

The company said in a news release it expects to mitigate the impact on affected employees by offering them work opportunities at other West Fraser operations.

West Fraser attributed the cuts to the B.C. timber supply shortage after the Mountain Pine Beetle infestation.

“Today’s decision better aligns West Fraser’s production with current timber supply,” said the release.

READ MORE: Tolko to curtail operations in Quesnel



editor@quesnelobserver.com

Like us on Facebook and follow us on Twitter

Just Posted

A tent housing a mobile vaccination clinic. (Interior Health/Contributed)
Over 5K jabbed at Interior Health mobile COVID-19 vaccine clinics

The clinics have made stops in more than 40 communities since launching last week

Provincial Health Officer Dr. Bonnie Henry talks about B.C.’s plan to restart the province during a press conference at Legislature in Victoria, Tuesday, May 25, 2021. THE CANADIAN PRESS/Chad Hipolito
Interior Health COVID-19 cases falling slower than the rest of B.C.

More than a third of provincial cases announced Thursday came from the Interior

A tent housing a mobile vaccination clinic. (Interior Health/Contributed)
Second dose vaccinations accelerating throughout region: Interior Health

To date, more than 675,000 doses have been administered throughout the region

Okanagan Lake (File photo)
Thompson-Okanagan ready to welcome back tourists

The Thompson-Okanagan Tourism Association expects this summer to be a busy one

Aerial view of a wildfire at 16 Mile, 11 kilometres northwest of Cache Creek, that started on the afternoon of June 15. (Photo credit: BC Wildfire Service)
Wildfire at 16 Mile now being held

Wildfire started on the afternoon of June 15 at 16 Mile, east of Highway 97

Marco Mendicino, Minister of Immigration, Refugees and Citizenship during a press conference in Ottawa on Thursday, May 13, 2021. THE CANADIAN PRESS/Sean Kilpatrick
Canada to welcome 45,000 refugees this year, says immigration minister

Canada plans to increase persons admitted from 23,500 to 45,000 and expedite permanent residency applications

Emily Steele holds up a collage of her son, 16-year-old Elijah-Iain Beauregard who was stabbed and killed in June 2019, outside of Kelowna Law Courts on June 18. (Aaron Hemens/Capital News)
Kelowna woman who fatally stabbed teen facing up to 1.5 years of jail time

Her jail sentence would be followed by an additional one to 1.5 years of supervision

Cpl. Scott MacLeod and Police Service Dog Jago. Jago was killed in the line of duty on Thursday, June 17. (RCMP)
Abbotsford police, RCMP grieve 4-year-old service dog killed in line of duty

Jago killed by armed suspect during ‘high-risk’ incident in Alberta

The George Road wildfire near Lytton, B.C., has grown to 250 hectares. (BC Wildfire Service)
B.C. drone sighting halts helicopters fighting 250 hectares of wildfire

‘If a drone collides with firefighting aircraft the consequences could be deadly,’ says BC Wildfire Service

A dose of the Pfizer-BioNTech COVID-19 vaccine is pictured at a vaccination site in Vancouver Thursday, March 11, 2021. THE CANADIAN PRESS/Jonathan Hayward
NACI advice to mix vaccines gets varied reaction from AstraZeneca double-dosers

NACI recommends an mRNA vaccine for all Canadians receiving a second dose of a COVID-19 vaccine

A aerial view shows the debris going into Quesnel Lake caused by a tailings pond breach near the town of Likely, B.C., Tuesday, Aug. 5, 2014. THE CANADIAN PRESS/Jonathan Hayward
Updated tailings code after Mount Polley an improvement: B.C. mines auditor

British Columbia’s chief auditor of mines has found changes to the province’s requirements for tailings storage facilities

A North Vancouver man was arrested Friday and three police officers were injured after a 10-person broke out at English Bay on June 19, 2021. (Youtube/Screen grab)
Man arrested, 3 police injured during 10-person brawl at Vancouver beach

The arrest was captured on video by bystanders, many of whom heckled the officers as they struggled with the handcuffed man

Patrick O’Brien, a 75-year-old fisherman, went missing near Port Angeles Thursday evening. (Courtesy of U.S. Coast Guard)
Search for lost fisherman near Victoria suspended, U.S. Coast Guard says

The 75-year-old man was reported missing Thursday evening

Most Read